Prefabricated cooling solutions for data centres
Fully welded modular SKID systems designed for efficient, safe and repeatable data centre installation.
From 3D design to on-site mounting
Based on a completed 3D design model, the system is divided into modules that are prepared, tested and delivered for efficient installation.
Design 3D
Completed 3D model is used to divide the system into modules.
Prefab + test
Modules are prefabricated and tested in the factory.
Transport
Modules are sectioned and prepared for safe transport.
Site mount
Flanged connections allow simple on-site assembly.
Modules are terminated with flanges, so installation can be completed without welding on the construction site.
Built for demanding technical environments
Reduced build time
Prefabrication helps shorten construction time on site.
Repeatable quality
Factory production supports consistent quality and repeatability.
Lower installation risk
More work is completed in controlled factory conditions.
Safe assembly
Modular delivery supports efficient installation in demanding environments.
Send us your project requirements.
Tell us what you need and we will help you plan an efficient modular delivery for your data centre cooling installation.